Rule 69 — Wages for overtime.

69(4)

The hours of work mentioned in Rule 64 may exceed under the followings works and circumstances in respect of dock, mine and building or other construction work, namely:-

69(4)(a) urgent repairs;

69(4)(b) work in the nature of preparatory or complimentary work;

69(4)(c) work which is necessarily so intermittent that the intervals during which they do not work while on duty ordinarily amount to more than the intervals for rest;

69(4)(d) work which for technical reasons must be carried on continuously;

69(4)(e) engaged in making or supplying articles of prime necessity which must be made or supplied every day;

69(4)(f) engaged in a process which cannot be carried on except during fixed seasons;

69(4)(g) engaged in a process which cannot be carried on except at times dependent on the irregular action of natural forces;

69(4)(h) engaged in an engine-rooms or boiler-houses or in attending to power-plant or transmission machinery;

69(4)(i) engaged in process on account of the break-down of machinery;

69(4)(j) engaged in the loading or unloading of railway wagons or lorries or trucks or ships;

69(4)(k) exceptional press of work; and

69(4)(l) engaged in any work, which is notified by the Central Government in the Official Gazette as a work of national importance: Provided that no worker shall be allowed to work overtime exceeding one hundred forty-four hours in any quarter of a year: Provided further that for overtime, a worker shall be paid wages as per section 27 of the Code at the end of each wage period.